Parade Parkway
Parade Parkway
Stonebrooke is providing planning, design, and construction oversight for the reconstruction of Parade Parkway in Minneapolis.
arrow View project details
dots
ADA Pedestrian Ramps
ADA Pedestrian Ramp Enhancements
Stonebrooke is providing design and construction services on the replacement of over 400 pedestrian ramp corners.
arrow View project details
dots
TH 30
TH 30 Final Design
Stonebrooke is providing final design on this federally funded foamed asphalt reclamation of TH 30 from Amboy to Mapleton, MN.
arrow View project details
dots
Transportation Interchange
Minneapolis Transportation Interchange
Stonebrooke provided surveying and 3D animation services on the proposed Transportation Interchance project in Minneapolis.
arrow View project details
dots
CSAH 22 (70th Street)
CSAH 22 (70th St)
Washington County hired Stonebrooke to prepare a corridor study of CSAH 22 (70th Street) to identify area improvement features.
arrow View project details
dots
CSAH 25 & Washington Ave
 	CSAH 25 (Adams Street) and Washington Avenue
McLeod County selected Stonebrooke to provide design services for the reconstruction of Washington Ave and CSAH 25 in Hutchinson.
arrow View project details
dots
CSAH 22 at Hawthorne St
CSAH 22 at Hawthorne St
Stonebrooke was hired by Freeborn County to analyze the intersection of CSAH 22 and Hawthorne Street in Albert Lea.
arrow View project details
dots
CSAH 68 at 91
CSAH 68 at 91
This project involves the reconstruction of the intersection of CSAH 68 at CSAH 91 to include a single lane roundabout.
arrow View project details
dots
CSAH 8 at 23
CSAH 8 at 23
This project involves the reconstruction of the intersection of CSAH 8 at CSAH 23 to include a single lane roundabout.
arrow View project details
dots
TH 246 at CSAH1/CR 81
TH 246 at CSAH 1/CR 81
This project involves the reconstruction and realignment of the intersection of TH 246 at CSAH 1 / CR 81 in the City of Northfield
arrow View project details
dots
TH 14 at TH 42
CSAH 8 at 23
This project involves the reconstruction of the intersection of TH 14 at TH 42 in Eyota, Minnesota.
arrow View project details
dots
Victory Memorial Parkway
Victory Memorial Drive
This project involves removing the roadway portion of the street intersections between Victory Memorial Parkway and 45th Avenue and replacing it with green space.
View project details
Pilot Lighting Study
Pilot Lighting Study
This lighting study is the largest of its kind in the State and will analyze how well LED and Induction street lighting compare to High Pressure Sodium.
View project details
TH 60 Phase 2
TH 60 Phase 2
This 2.5 mile road reconstruction includes a multi-lane roundabout at TH 60 and CSAH 35.
View project details
TH 60 Phase 1
TH 60 p1
This 6 mile long roadway is being redesigned from a 2-lane rural section to a 4-lane divided rural section.
View project details
West Beltline (CSAH 7)
TH 60 p1
Preliminary and Final Design of 2 miles of new rural two-lane 10-ton roadway with concrete surfacing.
View project details
Lowry Ave Phase 2
Lowry Ave Phase 2
This project extended the Lowry Ave Phase 1 project by 1.5 miles.
View project details
22nd Street Extension
22nd Street Extension
This feasability study involves the extension of 22nd Street from Minnehaha Avenue to Cedar Avenue.
View project details
TH 19 / 11th Ave
TH 19 / 11th Ave
The Level 1 Layout being developed for this project includes a single lane roundabout.
View project details
TH 3 / County Road 28
TH 3
The preliminary design of this intersection includes a multi-lane four-legged roundabout.
View project details
TH 610 / Zachary Lane
TH 610
The project objective is to develop two signalized and two multi-lane roundabout intersections.
View project details
TH 19
TH 19
The reconstruction of TH 19 included two single-lane roundabouts and a signalized intersection.
View project details
Lowry Ave Phase 1
Lowry Ave Phase 1
This project consisted of the reconstruction of the Lowry Avenue Corridor from West Broadway to Interstate 94.
View project details