| Parade Parkway |
![]() |
| Stonebrooke is providing planning, design, and construction oversight for the reconstruction of Parade Parkway in Minneapolis. |
| ADA Pedestrian Ramps |
![]() |
| Stonebrooke is providing design and construction services on the replacement of over 400 pedestrian ramp corners. |
| TH 30 |
| Stonebrooke is providing final design on this federally funded foamed asphalt reclamation of TH 30 from Amboy to Mapleton, MN. |
| Transportation Interchange |
![]() |
| Stonebrooke provided surveying and 3D animation services on the proposed Transportation Interchance project in Minneapolis. |
| CSAH 22 (70th Street) |
![]() |
| Washington County hired Stonebrooke to prepare a corridor study of CSAH 22 (70th Street) to identify area improvement features. |
| CSAH 25 & Washington Ave |
![]() |
| McLeod County selected Stonebrooke to provide design services for the reconstruction of Washington Ave and CSAH 25 in Hutchinson. |
| CSAH 22 at Hawthorne St |
![]() |
| Stonebrooke was hired by Freeborn County to analyze the intersection of CSAH 22 and Hawthorne Street in Albert Lea. |
| CSAH 68 at 91 |
![]() |
| This project involves the reconstruction of the intersection of CSAH 68 at CSAH 91 to include a single lane roundabout. |
| CSAH 8 at 23 |
![]() |
| This project involves the reconstruction of the intersection of CSAH 8 at CSAH 23 to include a single lane roundabout. |
| TH 246 at CSAH1/CR 81 |
![]() |
| This project involves the reconstruction and realignment of the intersection of TH 246 at CSAH 1 / CR 81 in the City of Northfield |
| TH 14 at TH 42 |
![]() |
| This project involves the reconstruction of the intersection of TH 14 at TH 42 in Eyota, Minnesota. |
| Victory Memorial Parkway |
![]() |
| This project involves removing the roadway portion of the street intersections between Victory Memorial Parkway and 45th Avenue and replacing it with green space. |
| Pilot Lighting Study |
![]() |
| This lighting study is the largest of its kind in the State and will analyze how well LED and Induction street lighting compare to High Pressure Sodium. |
| TH 60 Phase 2 |
![]() |
| This 2.5 mile road reconstruction includes a multi-lane roundabout at TH 60 and CSAH 35. |
| TH 60 Phase 1 |
![]() |
| This 6 mile long roadway is being redesigned from a 2-lane rural section to a 4-lane divided rural section. |
| West Beltline (CSAH 7) |
![]() |
| Preliminary and Final Design of 2 miles of new rural two-lane 10-ton roadway with concrete surfacing. |
| Lowry Ave Phase 2 |
![]() |
| This project extended the Lowry Ave Phase 1 project by 1.5 miles. |
| 22nd Street Extension |
![]() |
| This feasability study involves the extension of 22nd Street from Minnehaha Avenue to Cedar Avenue. |
| TH 19 / 11th Ave |
![]() |
| The Level 1 Layout being developed for this project includes a single lane roundabout. |
| TH 3 / County Road 28 |
![]() |
| The preliminary design of this intersection includes a multi-lane four-legged roundabout. |
| TH 610 / Zachary Lane |
![]() |
| The project objective is to develop two signalized and two multi-lane roundabout intersections. |
| TH 19 |
![]() |
| The reconstruction of TH 19 included two single-lane roundabouts and a signalized intersection. |
| Lowry Ave Phase 1 |
![]() |
| This project consisted of the reconstruction of the Lowry Avenue Corridor from West Broadway to Interstate 94. |