  TH 60 Reconstruction Phase 2
 
 

Client: Mn/DOT District 7

Location: Worthington, MN

Services Provided: Preliminary Design

Project Team: Arvidson, Marusenko

This road realignment / reconstruction project connects to Phase 1 and continues 2.5 miles north into Worthington, Minnesota. The proposed 4-lane divided rural section will transition to a 4-lane divided urban section as the roadway enters the City of Worthington. This project included the design of a multi-lane roundabout at the intersection of TH 60 and CSAH 35. Design services for the Level 1 Layout included preliminary design for roadway geometrics, profiles, drainage design and construction limits.

TH 60 Phase 2

Early concept geometrics for roundabout at TH 60 and CSAH 35

 

 

 

 
     