Education
Associate of Applied Science: Civil Engineering and Surveying Technology, North Dakota State College of Science
Survey Party Chief / Instrument Man
Victory Memorial Parkway Street Intersection Closure Project
Tyler is providing on site surveying and inspection services. The project involves the removal of the roadway portion of the street intersections between Victory Memorial Parkway and 45th Avenue and replacing it with green space.
Surveyor / Certified Inspector
CSAH 153 (Lowry Ave) Hennepin County (Phase 1 Construction Services)
Tyler provided on site surveying and inspection services for this project, which consisted of complete reconstruction of the roadway from Girard Ave to Interstate 94 in order to facilitate addition of left turn lanes, on-street bicycle lanes, raised median island, parking bays, and bus turn-outs. Design services included detail plans for roadway geometrics, concrete pavement design, storm sewer design, landscaping, signal design, and lighting.
Surveyor / Certified Inspector
CSAH 153 (Lowry Ave) Hennepin County (Phase 1 Construction Services)
Tyler provided on site surveying and inspection services for this project, which consisted of complete reconstruction of the roadway from Girard Ave to Interstate 94 in order to facilitate addition of left turn lanes, on-street bicycle lanes, raised median island, parking bays, and bus turn-outs. Design services included detail plans for roadway geometrics, concrete pavement design, storm sewer design, landscaping, signal design, and lighting.
Surveyor / Certified Inspector
CSAH 13 Waseca County
Tyler served as a surveyor/certified inspector for the construction staking and as-built surveying of the project. He also provided assistance with the Pay Item Quantity Documentation. This project was a roadway and trail reconstruction project consisting of grading, drainage, bituminous surfacing, and concrete sidewalk construction items.
Surveyor / Certified Inspector
Tyler has performed topographic surveys and construction staking on multiple Stonebrooke Engineering projects. His responsibilities include:
• Highway, residential, and commercial site construction layout
• Topographic surveys for preliminary planning and site design
• Construction as-built and ALTA surveys
• Land section breakdowns for rural boundary
• Survey and post boundary for residential and commercial lots
Surveyor / Certified Inspector
Rendezvous Park, West Fargo, North Dakota
Tyler performed construction staking on this project which involved the construction of a new 60-acre park including trails, ponds, waterfall, softball diamonds, roads, and parking lots.
Surveyor / Certified Inspector
Commercial District, Fargo, North Dakota
Tyler performed construction staking on this project which involved the construction of several new commercial developments including Stamart truck stop, Old Navy, PetSmart, strip malls, and business centers.
Certifications
Mn/DOT Construction Technician:
• Aggregate Production
• Bituminous Street I
• Concrete Field I
• Grading & Base I
• Erosion Control – Inspector/Installer