Stonebrooke Engineering Responsible Solutions

           
      SEI
      Services Projects Staff About Us Contact Us Careers
links
 
                         
     
  News
 
 
 

 

 
  News Article
 
 

Stonebrooke staff performing traffic analysis at two intersections in Southeast Minnesota

Stonebrooke Engineering is working with Mn/DOT District 6 (Rochester) to complete a detailed traffic analysis evaluation and corresponding geometric layout for two areas in Southeast Minnesota.  The first intersection, US Highway 14 at Trunk Highway 42,  is located in Eyota, MN.  The second intersection study considers the realignment  of roadways near the Trunk Highway 246 at  County Road 1/County  Road 81 conglomerate including, County Roads 22 and 82. 

Both studies include current and future roadway capacity needs, considering area development, safety analysis and the comparison of roundabout versus traffic signal and stop controlled  intersection operations.  Intersection operation study is based on the methodology of the 2000 Highway Capacity Manual through the use of SYNCHRO, a traffic analysis software program by traffic, for signalized and unsignalized conditions.  To measure the service and delay for a single-lane roundabout, the design program RODEL will be used.

Stonebrooke Engineering Traffic Studies

Return to home page

 

 

 

 
     
12467 Boone Ave Suite 1 - 2nd Floor Savage, MN 55378 Phone: (952) 402-9202 Fax: (952) 403-6803© Stonebrooke Engineering 2010