Stonebrooke Engineering Responsible Solutions

           
      SEI
      Services Projects Staff About Us Contact Us Careers
links
 
                         
     
  News
 
 
 

 

 
  News Article
 
 

Mn/DOT awarded Stonebrooke Engineering TH 60 Phase 1 and 2 Reconstruction in Worthington, MN

Stonebrooke Engineering was recently awarded final design of Phase 1 of the TH 60 Reconstruction project, and preliminary design of Phase 2. The first phase is a 6 mile road realignment / reconstruction beginning south of Worthington, and running north along TH 60. The existing 2-lane rural section is being redesigned into a 4-lane divided rural section. The second phase connects to Phase 1, and continues 2.5 miles north into the City of Worthington. The proposed 4-lane divided rural section will transition to a 4-lane divided urban section as the roadway enters the City. This project includes the design of a multi-lane roundabout at the intersection of TH 60 and CSAH 35.

TH 60 p2

Early concept geometrics for roundabout at TH 60 and CSAH 35

Read more about TH 60 Phase 1

Read more about TH 60 Phase 2

Return to home page

 

 

 

 
     
12467 Boone Ave Suite 1 - 2nd Floor Savage, MN 55378 Phone: (952) 402-9202 Fax: (952) 403-6803© Stonebrooke Engineering 2010